Meeting minutes

Attendees

Last Actions Review

Talking Points

Minutes of the discussion

1.     Test the SPS-BGI tank in EMI to replicate the environment where the detectors are installed and resolve communication issues.

2.     Install an SPS-BGI tank adapted to the LHC layout in the next YETS 24-25:

Discuss with the workshop the feasibility of producing a tank for YETS 24-25.

Discuss with the impedance group the integration of the SPS-BGI tank into the LHC layout at the location where the old LHC-BGI is installed.

Conduct a vacuum acceptance test of the SPS-BGI components (Staystik).

Action Items

Action

Responsible

·       Discuss with the workshop the feasibility of producing a tank for this YETS 24-25

ML

·       Discuss with impedance group the integration of SPS-BGI tank into LHC layout at the location when the old LHC-BGI are installed

ML

·       Vacuum acceptance test of the SPS-BGI components (Staystik)

o   Order Staystik

o   Vacuum acceptance test process completion

 

XEI

ML

·       Contact EMI to perform an electromagnetic interaction study to test the electronics

XEI