1. Test the SPS-BGI tank in EMI to replicate the environment where the detectors are installed and resolve communication issues.
2. Install an SPS-BGI tank adapted to the LHC layout in the next YETS 24-25:
Discuss with the workshop the feasibility of producing a tank for YETS 24-25.
Discuss with the impedance group the integration of the SPS-BGI tank into the LHC layout at the location where the old LHC-BGI is installed.
Conduct a vacuum acceptance test of the SPS-BGI components (Staystik).
|
Action |
Responsible |
|
· Discuss with the workshop the feasibility of producing a tank for this YETS 24-25 |
ML |
|
· Discuss with impedance group the integration of SPS-BGI tank into LHC layout at the location when the old LHC-BGI are installed |
ML |
|
· Vacuum acceptance test of the SPS-BGI components (Staystik) o Order Staystik o Vacuum acceptance test process completion |
XEI ML |
|
· Contact EMI to perform an electromagnetic interaction study to test the electronics |
XEI |