New chip readout boards delivered at CERN. Boards will NOT be distributed to institutes until Ricardo receives payment details from everybody who requested boards.
11:10
→
11:50
RD50-MPW4 - Test beam preparation40m
Annealing of wafer 3 irradiated samples: agreed to follow procedure for 'sweet spot' (80 minutes at 60°C)
Potentially use PCM packs (Phase Change Materials) for transport, T is not guaranteed
Ask if we can use freezers at DESY on arrival (somebody needs to be there on arrival during weeked)
Lab evaluation before test beam (I-Vs topside vs. backside bised, S-curves, trimDAC calibration, at a few different T)
Modifications of cooling setup
Have radiation protection office measure irradiated samples and produce document for DESY