PS-SPS Users Meeting for Week 35 held on August 29th, 2024

News from the PS & SPS Physics Coordinator

E.B. Holzer, M.R. Jäkel

Proton Run 2024

Ion Run 2024

Reminder: Beam time exceeding the limits of 2 weeks PS beam time and 1 week SPS beam time per year need the approval of one of these CERN committees: SPSC, LHCC, DRDC, INTC, RB or IEFC. Consider joining a DRD collaboration, if you require more beam time.

New opening : H8 main user week 36 & 37.
Please contact sps.coordinator@cern.ch if you have a proposal to use this beam time.

Target intensities:

News from the Facilities Operations Meeting (FOM) (M.R. Jäkel)

Multiple interventions grouped on Wednesdays to minimize the interruption. Beam stop NA at 23h for RP cool down.
Please see intervention report in the PS/SPS reports.

Upcoming SPS MDs next weeks :

https://be-dep-ea.web.cern.ch/content/md-planning-north-area
Dedicated SPS MDs - if not anounced differently - are taking place from 8:00 to 18:00

Evacualtion alarm in East Hall (Tue morning).
Strong reminder that in case of an evacuation alarm, you MUST leave the building and meet at the assambly point.

PS Machine Report (E.H.Maclean)

Good availability 95.1% (Thu-Thu)

Main activities

Main issues

SPS Machine Report (T. Levens, reported by K. Li)

Safety (A. Schouten)

nToF (M.Bacak and P.M.Milazzo)

Smooth data taking in all experimental area.
EAR1: 238U(n, g)
EAR2: 88Zr(n, g)
NEAR: Activation measurements

These measurements will run in parallel up to week 37.

Measurements are profiting of dedicated intense proton beams; thanks to the PS for continuous delivery of high proton flux, critically important for radioactive samples and mandatory for the 88Zr case.

East Area Beam Status (J. Bernhard)

On-call phone number: 67500

General: Evacuation alarm in the East Hall on Tuesday morning following an alarm from a gas sensor (vehicle in the building).

T09: Good operation. Beam to be set up with the users today.
T10: New CESAR version tested, rolled back to previous version, will continue testing during the week for next users.
T11: No user.

East Area Users Tour de Table

T8 Main: IRRAD/CHARM (S. Fiore)

Overall, another good week in terms of beam delivery to T8.
Intensity and dose goals reached in both IRRAD and CHARM.
During yesterday’s access, in IRRAD we are continuing with long-term irradiation experiments (TE-MSC, EN-MME).
Starting with the LHCb (KURARAY scintillation fibers) and HGCAL samples.

In CHARM we did only minor modifications to existing setups (BE-CEM), without moving the user rack from the irradiation point. SY-RF continue their tests.


T9 Outgoing Main: NP06 ENUBET (Please Put Your Name Here)

T9 Main: EIC ePIC LFHCal (Friederike Bock)


T10 Outgoing + Incoming Main: ALICE ITS3 (Week 36)(Please Put Your Name Here)

T10 Parallel: BE-EA (Please Put Your Name Here)

T10 Main: BI XBPF (Inaki Ortega(SY-BI))

Hello, I’m sorry I can’t attend the meeting as I have an important BI Project Board meeting about LS3 Readiness. Here’s an update on our beam test:

Inaki

T11 Outgoing No beam: P349 (Please Put Your Name Here)


North Area Beam Status (J. Bernhard)

On-call phone number: 67500

Protons on target

T2 T4 T10 T6 Date
30 54 21 30 19.08.
30 54 21 150 11.09.

General: Intervention on T4 wobbling magnet on Wednesday done, needed stop of SPS beam at 23:00 on Tuesday for radiation cooldown (9 h beam time lost). Reminder: Requests for experimental gases have to be done well in advance, also for the XCET Cherenkov counters.

H2/H4/H6/H8/M2: Good operation.
P42/K12: Good operation. Intervention for smoke detection yesterday took longer than anticipated, about 1h beam time lost. After intervention, some troubles for the ECN3 ventilation appeared which are being handled at the moment.

AWAKE (M. Bergamaschi)

On Monday 26/08/2024 started forth proton run of the year for 3 weeks.

Monday spent on ebeam and pbeam checks
Tuesday plasma and laser diagnostics check
Wedneday: access

North Area Users Tour de Table

P42-K12:

NA62 (Sergey Kholodenko)

M2:

Main: NA64mu (Vladimir Poliakov)

H2:

Outgoing Main: TECHNO CLS (Stefano Carsi)

Please, see attached slides

Main: FASER PRESHOWER (Please Put Your Name Here)

Incoming Main: ALICE FOCAL (Week 36) Tommaso Isidori


- Test of FoCal-H H2GCROC based readout. FoCal-H is a 9 modules (6.5cm2 x 110 cm) detector for a total of ~400kg. The detector will be hold on a special aluminum bar on top of the DESY table. 
- Test of FoCal-E pixel layers prototypes. Prototyoes inherited by pCT design, they are hosted inside a movable stack of tungsten absorbing layers. Measurement of the shower profile and containment while applying back bias on the sensors. 
- The Setup will be on top of the concrete platform next to the Nikhef frame. The beam pipe will have to be extended closer to the detector surface
- Beam request: 
    - Hadrons: 60 - 400 GeV
    - Electrons: 20 - 350 GeV
    - rates: 10^4 - 10^5 
- Misc. request: 
    - tables for power suppliers and electornics
    - 19-inch rack
    - large control room (~10 people during shifts)

H4:

Main: NP04 (Christos Touramanis)

Smooth data taking, stable detector.
The beam needs a bit of centering after stops, thank you to Bastien Rae and operators on shift for doing that for us.
Completed running at 5 GeV, collected 2M beam events with kaon & (anti)proton trigger, equally split between the two polarities.
Now back at 1 GeV to compelte our pion sample.

H6:

Main: ATLAS ITK PIXEL (Martina Ressegotti)

21/22 installation, our most powerful cooling system typically takes at least 1 day to be set up, we needed a second day also due to some DUTs not working.
Taking good data since Friday.
We are now moving to the second batch (accessed yesterday 28/8), need to access again today in the morning due to connections issues. We hope to be able to move to a third batch in the weeked (so another 1-day access probably expected)

Incoming Main: ATLAS ITK STRIP (Week 36) (Lennart Huth)

H8:

Main: DRD6 IDEA DRC (Iacopo Vivarelli, Seungkyu Ha)

Incoming Main: CMS MTD BTL (Week 36) (Please Put Your Name Here)

Incoming Parallel: CMS PPS (Week 36) (D. Lazic for Francisco Garcia)

Participation confirmed, tests of new ETROC detectors foreseen.

Parasitic Users

H6: ATLAS MALTA (Please Put Your Name Here)

H6 Incoming: CMS MTD ETL (Week 36) (Murtaza Safdari)

Apologies for the absence of our team during this meeting once again, due to time zone differences this time (everyone now back in the US).

For week 36, we will be testing new assemblies in a 3 plane telescope setup (for time resolution studies) mounted to the AIDA telescope PI stage in PPE156. We have completely new assemblies to test, along with assemblies previously tested at Fermilab (with cosmics) that need to be verified in beam. During this week we will also be coordinating with the CMS PPS test beam (H8 parallel) to continue the bias voltage scan that we started during our previous test beam in week 33.

H8: STRAW TRACKER RD (Temur Enik, Katerina Kuznetsova)

T10: ALICE ITS3 (Please Put Your Name Here)


AoB

Minutes by the respective speakers, edited by E. B. Holzer, M. Jäkel, T. Shulha, and M. Schwinzerl