Présent:
Richard, Antoine, JL, Matthew, Thomas, Eva, Ivan Ramirez, Yves, Ivan Josifovic
Muon Shield 1 the option with Boreal 2 P
For the LHC4kA number should consequence to be discussed during SHiP collaboration
Possible manual reconfiguration to minimize number
Muon Shield 1 in case of late development of SC option could leed to delay up to LS4
Yves to check if (2) 3 NC11 are available in BA82 in case baseline will moved to normal conducting magnet
EPC ok for dismantling after BA80 dismantling 3-4 converters as intermediate solution
Yves to devied the table in 2: post LS3 and LS4
2x 18Kv cell (status to be confirmed by EN-EL following test this YETS 24-25, 15-16 january 2025)
EN-EL cabling DC cabling to to checked with new rating
Cooling station
BA82 currently 1 pump out of service (no redundancy)
Final configuration for demiwater for PCs in BA82 should in the order to 300kW
Machine protection
Dillution magnets FGC and will follow a function (2-4 converters)
Muon shield + hadron stopper protection each PC (5) need to be connected
Sampling rate failure detection of DC magnet to checked
Maximum rating from over DC WIC
The SHiP magnets and the dillution magnets need to be connected to the WIC
2 WIC systems to be operationnal in BA82 (old for M2, and SHiP with new WIC)