PS-SPS Users Meeting for Week 36 held on September 4th 2024

Coorinator for this week : Babara E. Holzer

News from the PS & SPS Physics Coordinator

E.B. Holzer, M.R. Jäkel

Proton Run 2024

Ion Run 2024

Reminder: Beam time exceeding the limits of 2 weeks PS beam time and 1 week SPS beam time per year need the approval of one of these CERN committees: SPSC, LHCC, DRDC, INTC, RB or IEFC. Consider joining a DRD collaboration, if you require more beam time.

New opening : H8 main user week 36 & 37.
Please contact sps.coordinator@cern.ch if you have a proposal to use this beam time.

Target intensities:
See here or via ASM (accessible from within the CERN network).

News from the Facilities Operations Meeting (FOM) (M.R. Jäkel)

Upcoming SPS MDs next weeks :

https://be-dep-ea.web.cern.ch/content/md-planning-north-area
Dedicated SPS MDs - if not anounced differently - are taking place from 8:00 to 18:00

PS Machine Report (Y. Dutheil)

SPS Machine Report (A. Spierer)

Safety (J. Devine and M. Jankowski)

nToF (M.Bacak and P.M.Milazzo)

Smooth data taking in all experimental area.
EAR1: 238U(n, g)
EAR2: 88Zr(n, g)
NEAR: Activation measurements

Measurements are profiting of dedicated intense proton beams.

East Area Beam Status (M. van Dijk)

On call phone number: 67500

T09: Some issues with BHZ031 trips at 15 GeV/c operation (852A). On 03.09., a dedicated test on this converter during the PS stop was done. Some parameters have been changed and now the converter is to be monitored.
T10: Good operation.
T11: No user.

East Area Users Tour de Table

T8 Main: IRRAD/CHARM (F. Ravotti)

Good week. POT above the reference intensity for T8 (~2.5e16 p/w, see plot below). During the day we will update the plot including the CHARM target TID. Target was removed during the beam stop at the beginning of the week. The centering of the T8 beam on the horizontal plane was less good than the previous nine weeks: ~85% for this W35 against >90% in W26-W34.

We are in access today from 9:00. in IRRAD, after the summer weeks where we run mosty the long irradiation experiments, now we have several short one in the pipeline (FOS for ITk, LHCb PicoCal, ALICE FoCal SiPM, CMS HGCAL, etc.). Some of these we are installing today. In CHARM we are exchanging test setups for TE-MPE and SY-EPC. In CHARM we are also testing several types of RFID tags to study their radiation tollerance in the framework of the EU-funded AIDAinnova project.

The RP week (September 18-25) is confirmed and during this period T8 will request a reduced duty-cycle (e.g. we will need less spills than usual, details in the coming weeks). Also the cryogenic run in IRRAD is confirmed from mid-october till the end of the proton run.

T9 Main: EIC ePIC LFHCal (F. Bock)

Good week over all. First part of the campaign finished using HGCROC read-out. Now switching to CAEN read-out. Should be done with the switch by mid-day.

T9 Incoming Main: SHIP (Week 37) (Please Put Your Name Here)

T10 Outgoing Parallel: BE-EA (D. Banerjee)

Successful test with 15 GeV/c proton beam on target and 0.8 s flat top. Beam composition scans taken at 3, 6, 8, and 10 GeV/c. Results are being summarised.

T10 Outgoing Main: BI XBPF (Please Put Your Name Here)

T10 Main: ALICE ITS3 (Paolo Martinengo)

Useful parasitic run, reconfiguring set-up

T10 Incoming Main: BL4S (Week 37) (Seyma Esen)


North Area Beam Status (M. van Dijk)

On call phone number: 67500

Target Sharing (also available via ASM, accessible from within the CERN network)

T2 T4 T10 T6 Date
30 54 21 30 19.08.
30 54 21 150 11.09.

General: Problem with public network (GPN) in the North Area on Monday. At some point the network was completely off, so the beam was stopped for about an hour as nobody was able to take data. This also affected the telephones and terminal computers in the control room.

H2/H4/H6/H8: Good operation.
P42/K12: Good operation.
M2: Good operation. The trips in the MS2 MBPL magnet came back on 03.09. (4 trips). This magnet is planned to be thoroughly checked after the deinstallation tomorrow. Low momenta muons checked down to 40 GeV/c.

AWAKE (M. Bergamaschi)

Week 35:

  M T W Th F S S
SPS extractions to AWAKE 129 456 MD 154 1028 1059 1146
Hours of beam to AWAKE 1.3 3.3 MD 2.4 7.4 6.3 7
Hours requested 1.3 3.4 MD 3 9.5 8 9.5

Detailed program:

Week 36:

  M T W
SPS extractions to AWAKE 257 MD MD
Hours of beam to AWAKE 2.4 MD MD
Hours requested 8 MD MD

Detailed program:

North Area Users Tour de Table

P42-K12:

NA62 (Sergey Kholodenko)

M2:

Main: NA64mu (Please Put Your Name Here)

Incoming Main: MUONE (Week 37) (Carlo Ferrari)

H2:

Outgoing Main: FASER PRESHOWER (Lorenzo Paolozzi)

Main: ALICE FOCAL (Tommaso Isidori)

Incoming Main: CMS HGCAL (Week 37) (Please Put Your Name Here)

H4:

Main: NP04 (Christos Touramanis)

Smooth data taking since last meeting. Doing further integration work during beam-down times, e.g. ionisation laser full integration into TDAQ in recent days. We will continue at 1 GeV until the end of our run on 16 September.

H6:

Outgoing Main: ATLAS ITK PIXEL (Andre Rummler)

(Sorry, can not stay connected as I have to join the TIOC at 1100.)
After some start-up issues we took very successfully a lot of data with two irradiated 150um Micron RD53B quads at 0° and 15° inclination as well as the with a Micron 100um SCC and HPK 150um quad, both ItkPixV1, at 0°. Bias voltages as well as tuning thresholds were varied. ToT studies were conducted. Unfortunately, after changing to 15°C the two V2 showed bad communication which occurred already previously and has to be debugged offline. Measurement with them will be continued during the next test beam. Tuning software was updated improving some errors. Due to issues with the third batch we dismantled already yesterday night and I handed over this morning to ITk strips.

Main: ATLAS ITK STRIP (John Keller)

Setup is ongoing. Samples have arrived from IRRAD. We will run with Mimosa and Alpide telescopes, and TimePix as a timing plane.

Incoming Main: ATLAS BCM PRIME (Week 37) (Please Put Your Name Here)

Incoming Parallel: ATLAS HGTD (Week 37) (Djamel Boumediene, Stefano Manzoni)

Incoming Parallel: CMS PIXEL (Week 37)(Please Put Your Name Here)

H8:

Outgoing Main + Incoming Parallel: DRD6 IDEA DRC (Week 37) (Please Put Your Name Here)

Main: CMS PPS (F. Garcia)

The setup consists of three platforms: The Triple GEM tracker, the ETLROC tracker and the Trigger and Diamonds platform.

The ETLROC tracker is the new platform on this test beam. The two others are already from the beggining of the year and already inspected before.

The beam required is: Pions at 180 GeV/c with a beam spot of 10-12 mm RMS for both planes.

The installation is now going on and expected safety inspection scheduled at 16:30

Incoming Parallel: BI XBPF (Week 37) (Please Put Your Name Here)

Parasitic Users

H6: ATLAS MALTA (Please Put Your Name Here)

H6: CMS MTD ETL (Murtaza Safdari)

We will be running two setups again this week, with one setup (3 plane telescope) mounted to the AIDA telescope PI stage. This will be used to extract some time reoslution data from new ETROC2+LGAD assemblies with 120 GeV pions.

In addition, the usual 4 plane suitcase style telescope will be placed in H8 along with the PPS team to continue the bias scan of ETROC2+LGAD assemblies with 180 GeV pions.

H8: STRAW TRACKER RD (Please Put Your Name Here)

H8: BI XBPF (Please Put Your Name Here)

T10 Outgoing: ALICE ITS3 (Please Put Your Name Here)


AoB

Minutes by the respective speakers, edited by E. B. Holzer, M. Jäkel, T. Shulha, and M. Schwinzerl