Minutes:
- Anti-cryostat #1 can probably be sent to CEA at the end of November.
- The electronic can be tested remotely once the two MRUs arrive to CEA
- The anti-cryostat #2 can be transported in 311, and the second shaft can be assembled and inserted only once the lifting beam is repatriated from the first transportation.