We need to prepare for (pre) Scrubbing. A WBS 2.3 L3 template has been shared https://docs.google.com/presentation/d/1mU1eDQQxIE3Lm6qqZsLFPZ-EtmjrgbxXxggr61gJau4/edit?usp=sharing
- Target is having draft slides by June 9th (to be confirmed)
The 5-year evolution spreadsheets for the Tier-2 facility is complete but still needs updates and final numbers
- Each Tier-2 should be working on spending plans for a possible end of CA distribution (see Tier-2 Spending Proposal)
- Tier-2 managers will meet Friday to discuss
HTC25 is fast approaching. We have a draft agenda started at https://agenda.hep.wisc.edu/event/2297/timetable/#20250605.detailed
- Comments welcome
LHCOPN/LHCONE meeting proposed shutting off IPv4 for LHCOPN
- HEPiX IPv6 working group discussed today and we want to see if ATLAS/BNL and CMS/FNAL are willing to try this with the expectation that any IPv4 traffic fails over to LHCONE
- Phil Demar is asking CMS and FNAL if they are will to try to do this in the next month or two. Shawn is tasked with doing the same for ATLAS and BNL.