HCAL: Imformation collected so far are all encoraging
- CAD drawaing provided to CERN integration team
- logistics from CERN surface commissioing to the experimental area to be considered
- [TODAY] Electronics (readout, trigger, and PS) info summarized with questions to USTC
- need to itemize task lists for
- [TODAY] Simulation update
- last presentation showes promissing expectaition to detect v_e interaction
- need to discuss
- trigger efficiency based on possible configuration
- position / energy resolution
- additional components, i.e, veto scintilator
- [TODAY] Inputs from theory team
- how we discriminate v_e from charm from v_e from light quark
- implication in nuclear / astophysics
- implication in particle phsics, e.g, improvement of higgs prod. cross from PDF unc.
ECAL: still need to understand how it works
- assembly itself in USTC takes time?
- high energy muon available (~1 Hz/cm2) in CERN surface area (EHN1) and the experimental site (TI12) is not enough?
- need beam test with electron beam?
- trigger rate?