Issues:
- Pilot failures due to xrootd-set nproc limit
- Fully mitigated now
- Turned out xrootd client also sets max open files limit when imported :-(
- Has not affected anything (yet)
- A lot of rescheduled and failed jobs at all T1 sites, due to a problem with EOS-pilot SE at CERN
- Lots of failed transfers to SARA from all T1 sites
Data Challenge (sorry, can not edit appropriate section):
- Very good throughput on Monday and Tuesday, well above the target
- Much better than during the DC24
- the rate reduce a bit during the OPN cut, but still was close to the target
- Not so good rate on Wednesday, where gateways were struggling
- Read test on Thurdsay (RAL -> CERN), failed completely due to storage problems at CERN
- Checksum tests on Friday, worked well (at least from client perspective)
- Simultaneously with the challenge, LHCb started new Sprucing workflow, where jobs running at RAL download data directly from CERN (eospilot SE), that contributed to the OPN load (and LHCONE a bit, due to old WN gens).