Mid-December or early January for tunnel installation.
Surface commissioning planned at a designated site (EHN1) starting around September.
Shipping from China is tentatively scheduled for the end of June or the beginning of July, allowing for 2–3 months of commissioning prior to installation.
Logistical Considerations:
Transportation challenges include ensuring safe handling of the heavy detector and managing the additional shielding needed near the beam pipe.
Coordination between USTC, CERN, and Japanese teams is necessary to finalize the schedule and logistics.
Commissioning Discussion
Commissioning Strategy:
The discussion emphasized the importance of starting commissioning as soon as possible, even if not all teams can be present on day one.
There was a suggestion that the commissioning should be initiated at USTC, with some teams joining later due to scheduling constraints (notably, Japanese fiscal year considerations may delay full participation until April).