Impact of MTE on PS septa (J. Borburgh) - Discussion
 
Massimo asked if an answer on the use of the CT septum and related elements should really be provided by the end of 2011. Jan answered that an answer on the dummy septum option should also be given by the end of the year.
Thomas asked what was the expected lifetime of the dummy septum. Jan answered that the dummy septum would be built to require a minimum amount of maintenance.
Roland asked how much time is required to replace the septum 31 that is in operation. Jan answered that only a couple of days are required. It can easily fit in the Christmas shutdown.
Simone asked if a spare dummy septum would be built. Jan answered that, as the device is simple, two dummy septa could be built.