MEDICIS
Last Week
- VD-5 TaC testing in the framework of Patricija's PhD.
- Terbium di-fluoride molecules with CF4 injection.
- > 1 MBq collected and could have collected more - stopped for direct irradiation. No shippment was done due to NPL not able to recieve the sample.
- Direct irradiation of TaC for Tb run thursday-friday morning.
- Temperature of the target reached ~120 oC
- Target #886M-VD-5 failed due to ion source short circuit.
This Week
- #880M preparation with ThC charge for anticipation of indirect irradiation over weekend
- If proton beam does not exceed 2 uA
- A need to anticipate 30 min for target change on thursday. MEDICIS is flexible with target change timing
Next week
- If #880M irradiated over weekend - testing of the target on FE
- MD runs for new CCM gas application and mass scans from VD-5 ion source target units
- 2nd indirect irradiation of the #880M ThC target from thursday
- Preparation for Ra-224/225 collection
- Preparation of the pumpstand for the release studies (target change)