Gas systems weekly project meeting

Europe/Zurich
32/1-A24 (CERN)

32/1-A24

CERN

40
Show room on map
gas systems project meeting
Zoom Meeting ID
62095888225
Host
Beatrice Mandelli
Useful links
Join via phone
Zoom URL

piquet:

10/4

ALICE-MID purifier temperature HH alarm -> [GASSYSTEMS-600] ALICE-MID purifier temperature HH alarm - CERN Central Jira

TGC liquid in trap alarm -> [GASSYSTEMS-601] TGC liquid in trap alarm - CERN Central Jira

3/4

CMS-RPC purif 1 not doing vacuum during regeneration [GASSYSTEMS-590] CMS-RPC purif 1 not doing vacuum during regeneration - CERN Central Jira

need to be tested after maintenance of the pump. update ticket.

 

ALICE-TRD Xe recuperation how to inject [GASSYSTEMS-591] ALICE-TRD Xe recuperation how to inject: procedure - CERN Central Jira

 

27/3

MDT humidifier -> Checklist back for all!

 

20/3

CMS-RPC purifier 1 not reaching the pressure for phase 2 --> to check why [GASSYSTEMS-602] CMS-RPC purifier 1 not reaching the pressure for phase 2 - CERN Central Jira

CMS change cap closed-open and ventilation --> for Salvatore e Aleksandar -> it was a mistake from the operator

 

dove sono i ticket di cavern closure dei quattro?

 

checklist dove sono? --> ticket IO [GASSYSTEMS-573] weekly checklists files missing: ATLAS and CMS - CERN Central Jira

--> ATLAS remains to be done

 

TOO MANY ENTRY FOR DATAPOINTS -> 

[GASSYSTEMS-558] ALICE: datapoint archiving too often - CERN Central Jira

[GASSYSTEMS-559] ATLAS: datapoint archiving too often - CERN Central Jira

[GASSYSTEMS-560] CMS: datapoint archiving too often - CERN Central Jira

[GASSYSTEMS-561] LHCb: datapoint archiving too often - CERN Central Jira

 

ALICE

70 report from Anité [GASSYSTEMS-70] TPC gas quality - filters to Benoit - CERN Central Jira (I don't see the report, can you please add it?)

TRD leak is still there. To update ticket 

 

 

ATLAS

MDT high flow (wrong mixture, CO2 injected instead of Argon): how to spot in advance?

MDT pump: supplier reply? frequency converter? --> Philipp to be informed that some test at some point will be needed [GASSYSTEMS-592] MDT pump: supplier reply? frequency converter? - CERN Central Jira

TGC fill (experience) on April 1st. Still confirmed after the He leak problem? --> [GASSYSTEMS-593] TGC fill: experience summary - CERN Central Jira

check nC5H12 stock -->ticket IO [GASSYSTEMS-574] ATLAS-TGC nC5H12 stock - CERN Central Jira

how many litres?

how many days if we take last year consumption?

Thanks a lot! 

problem with n-penthane tank level measurement -> [GASSYSTEMS-603] TGC problem with n-penthane tank level measurement - CERN Central Jira

ATLAS-TGC flow difference --> [GASSYSTEMS-612] ATLAS-TGC flow difference - CERN Central Jira

heating controllers for ATLAS --> ticket IO -> out od yets & Patrick for cost estimate [GASSYSTEMS-576] ATLAS heating pipe cabinets - CERN Central Jira

 

 

CMS

CF4 pressure sensors for vacuum received --> test needed -> w14 [GASSYSTEMS-577] CF4 absorber new vacuum pressure sensors - CERN Central Jira

R134a insulation - isol'tut to check and see what to do -> ticket IO [GASSYSTEMS-578] R134a insulation - isol'tut to check and see what to do - CERN Central Jira

How much gas flow we need for the RPC purifier? --> OFFLINE with Maria Cristina [GASSYSTEMS-579] CMS-RPC How much gas flow we need for the RPC purifiers? - CERN Central Jira

RPC bypass pump too much closed --> [GASSYSTEMS-604] RPC bypass pump too much closed - CERN Central Jira

RPC H2O ExhToDist    CMSAUX_An_XANA9319AS 159 5000 ppm, but is it not normal? --> [GASSYSTEMS-605] RPC H2O ExhToDist 5000 ppm is ok? - CERN Central Jira

RPC double flow test -> ticket? exists? [GASSYSTEMS-392] RPC test of double the flow in one rack - CERN Central Jira

RPC with CO2 like ATLAS and effect on R134a recuperation -> [GASSYSTEMS-606] RPC with CO2 like ATLAS and effect on R134a recuperation - CERN Central Jira

GEM chamber pressure alarm for stop -> ticket with GEM responsible [GASSYSTEMS-580] GEM chamber pressure alarm for stop - CERN Central Jira

GEM 904 would like to move their mixer to PLC -> ticket already exists. check  [GASSYSTEMS-468] Re: 904 GEM gas system - CERN Central Jira

CSC 904 new panels -> for LS3 -> ticket Andrea? [GASSYSTEMS-581] CSC at 904 - CERN Central Jira

RPC 904 new line -> ticket Andrea? [GASSYSTEMS-582] RPC 904 new line - CERN Central Jira

RPC904 cleaning of lines -> follow ticket [GASSYSTEMS-556] 904 RPC gas distribution panels not working properly - CERN Central Jira

R134a Upgrade (hardware and software) to be tested -> [GASSYSTEMS-594] R134a Upgrade (hardware and software) to be tested - CERN Central Jira

 

LHCb

CODEX-b --> purif to be prepared, calibration of O2 and some test  -> ticket? IO [GASSYSTEMS-466] CODEX commissioning - CERN Central Jira

LHCb console in US not working -> to Gianluca [GASSYSTEMS-583] LHCb console in US not working - CERN Central Jira DONE

should we postpone real filling? Patrick to ask Christoph [GASSYSTEMS-584] RICH1: should we postpone real filling? - CERN Central Jira UPDATE

RICH2 CO2 from purifier-> check how to decrease-> ticket IO [GASSYSTEMS-585] RICH2 [CO2] from purifier-> check how to decrease - CERN Central Jira

RICH2 form where the CO2 entered -> from backup? how long was it in stop? -> [GASSYSTEMS-607] RICH2 form where the CO2 entered -> from backup? how long was it in stop? - CERN Central Jira

RICH1 what we learn from 1st fill -> [GASSYSTEMS-608] RICH1 what we learn from 1st fill - CERN Central Jira

for example: RICH1 membrane bypass is a problem?

Patrick, can you put the excel checklist as attachment in the weekly summary?

 

NA62

CEDAR filling planned for April 14th -> [GASSYSTEMS-492] NA62 CEDAR H2 filling - CERN Central Jira  Done 

CEDAR maintenance needed -> [GASSYSTEMS-609] CEDAR maintenance needed - CERN Central Jira

pressure sensors S/N to follow -> [GASSYSTEMS-595] NA62-CEDAR pressure sensors - CERN Central Jira MattiaB or Damiano?

 

CHARM test pressure sensors -> [GASSYSTEMS-610] CHARM test pressure sensors - CERN Central Jira

 

non-LHC safety valve --> check lista di Fabio

[GASSYSTEMS-172] non-LHC safety valves to be verified - CERN Central Jira

ELOG - safety valves to be verified for non-LHC systems

 

 

 

Additional requests/projects/discussions

New Gas panels for DRD1 test beam [GASSYSTEMS-586] RE: New Gas panels for DRD1 test beam - CERN Central Jira

887 CEDAR new "mixers" --> [GASSYSTEMS-509] CEDAR for beam lines - CERN Central Jira

 

 

examples of topics for the common discussions:

 

-cms id flushing -> Andrea

-cms r134a operation and spare -> Andrea

-cms cf4 operation and spare -> Andrea

-atl tgc nc5h12 -> Kacper

-Analysis boxes -> LPh

-C4F10 new recuperation installation -> Patrick

 

There are minutes attached to this event. Show them.
    • 09:00 09:10
      Piquet interventions 10m
      Speakers: Gianluca Rigoletti (CERN), persons on piquet
    • 09:10 09:40
      YETS tickets/planning 30m
      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Gianluca Rigoletti (CERN), Kacper Kapusniak (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Roberto Guida (CERN)
    • 09:40 10:10
      Review new ticket or updated during current week 30m

      Jira dashboard: https://its.cern.ch/jira/secure/RapidBoard.jspa?rapidView=9098&view=detail
      Confluence page: https://confluence.cern.ch/display/KBFGS

      Speaker: Roberto Guida (CERN)
    • 10:10 10:20
      gas systems status during yets 10m
    • 10:20 10:25
      other M&O news 5m
      Speakers: Beatrice Mandelli (CERN), Gianluca Rigoletti (CERN)
    • 10:30 10:35
      Gas mixture analysis for LHC experiments 5m

      https://epdt-gasmonitoring.web.cern.ch/

      Speaker: Maria Cristina Arena (CERN)
    • 10:35 10:40
      FSU planning for coming weeks & Jobs status 5m
      Speaker: Andrea D'Auria (CERN)
    • 10:40 10:50
      Pump working hours, EAM/Infor, maintenance and spare parts follow-up 10m
      Speaker: Miguel Afonso (Universidade de Lisboa (PT))

      any maintenance performed from last Thursday?

      ALICE

      27/3 MID 4201 

       

      ATLAS

      3/4 RPC purif 1 pump

       

      CMS

      27/3 DT 4101 + 4201

      3/4 RPC purif 1 pump

      8/4 R134a compressor

    • 10:50 11:00
      list of projects for 2025 and beyond 10m
      Speaker: Roberto Guida (CERN)
    • 11:00 11:10
      procedures summary 10m
      Speaker: Roberto Guida (CERN)
    • 11:10 11:20
      aob and requests for jobs at workshop 10m
      Speakers: Amin Bouzaiene (Politecnico di Torino (IT)), Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Burkhard Schmidt (CERN), Damiano Galassi, Gianluca Rigoletti (CERN), Kacper Kapusniak (CERN), Louis-Philippe De Menezes (CERN), Maria Cristina Arena (CERN), Mattia Busato (CERN), Mattia Verzeroli (Universite Claude Bernard Lyon I (FR)), Michal Zbigniew Zimny (CERN), Miguel Afonso (Universidade de Lisboa (PT)), Paolo Petagna (CERN), Patrick Carrie (CERN), Pieter Vanslambrouck, Roberto Guida (CERN), Stefania Juks (Université Paris-Saclay (FR))

       

      DAMIANO:

      • R134a Distillation I only see Fabio available but also Abdel is needed for welding volumes/buffers/column (at least one full week). If we do not proritize this part me and Fabio will have to stop at a certain point. So it would be better to have them in parrallel or Abdel first.

       

      CMS-RPC-904

       

      CHARM test

      • pressure sensor test
      • Jo needed April 30 and May 7 . ++

       

      ND280

      • 12x adaptor 1/4" to 6mm (if not already existing on swagelok catalogue)
      • 1 buffer of about 28 cm length and 9 cm diameter

       

      ABSORBER TESTS

      • fill one purifier cartrige with MolSieve Z10 1-2 mm and measure DP and heat up (to 90 C) and cool down time

       

      MAGASIN

      • start preparing the area in the mezzanine
      • start organising electrical and mechanical spare