GENERAL UPDATE:

 

WINDING TESTS - PLANNING (TOOLING):

The list of action items for the next weeks is listed here:

  1. Create a program for the winding test 
  2. Modify winding clamps and get ready for a new winding test
  3. Pole study - Design a campaign of tests to study the optimum distance in between the hard-way bend exit and the beginning of the soft-way
  4. Layer jump study - Think / design a two layer mock-up of the head geometry including layer jump

 

WINDING TESTS - PLANNING (TESTS):

The list of action items for the next weeks is listed here:

  1. Winding test with 2-3 turns using the program and the new clamps mentioned above. Create a small report
  2. Winding tests for the pole study mentioned above. Create a small report
  3. Winding tests for the layer jump study mentioned above. Create a small report