what is coming next:
Preparation of the purifier cartridge (this is ongoing)
MFCs calibration setup to be reassemble asap
[GASSYSTEMS-644] MFCs calibration setup to be reassemble asap - CERN Central Jira
GIF++ TGC gas system and return flow
[GASSYSTEMS-624] GIF++ TGC gas system return flow - CERN Central Jira
New Gas panels for DRD1 test beam
[GASSYSTEMS-586] RE: New Gas panels for DRD1 test beam - CERN Central Jira
887 CEDAR new "mixers" MFC for a test
[GASSYSTEMS-509] CEDAR for beam lines - CERN Central Jira
Fondoscala del MFC di R134A e sensore umidità del gas RPC
[GASSYSTEMS-645] Fondoscala del MFC di R134A e sensore umidità del gas RPC - CERN Central Jira
R134a recuperation distillation v2
[GASSYSTEMS-646] R134a recuperation distillation v2 - CERN Central Jira
1st prototype R134a absorption (elec 10, mech 10, weld 10)
[GASSYSTEMS-647] 1st prototype R134a absorption - CERN Central Jira
Setup for gas compression
[GASSYSTEMS-654] Setup for gas compression - CERN Central Jira
Mixeurs gaz pour test sniffer
[GASSYSTEMS-485] RE: Mixeurs gaz pour test sniffer - CERN Central Jira
GEM 904 would like to move their mixer to PLC
[GASSYSTEMS-468] Re: 904 GEM gas system - CERN Central Jira
CSC 904 new panels -> for LS3
[GASSYSTEMS-581] CSC at 904 - CERN Central Jira
RPC 904 new line
[GASSYSTEMS-582] RPC 904 new line - CERN Central Jira
Setup leak test and more atelier
[GASSYSTEMS-52] Leak test setup for workshop - CERN Central Jira
small cartridges conditioning
[GASSYSTEMS-648] small cartridges conditioning - CERN Central Jira
small cartridges regeneration
[GASSYSTEMS-649] small cartridges regeneration - CERN Central Jira
gas mixtures preparation for calibration of analysers
[GASSYSTEMS-650] gas mixtures preparation for calibration of analysers - CERN Central Jira
Material to recuperate from CEDAR-H test zone in 887 ->
[GASSYSTEMS-664] Material to recuperate from CEDAR-H test zone in 887 - CERN Central Jira
old TRD gas system what to do ->
[GASSYSTEMS-665] old TRD gas system what to do - CERN Central Jira
CLOUD electrical plan to start asap -> start when? LPh to say when!
[GASSYSTEMS-666] CLOUD electrical plan to start asap - CERN Central Jira
Inventory of mechanical and electrical spares already available and present in the workshop
[GASSYSTEMS-651] Inventory of mechanical and electrical spares already available and present in the workshop - CERN Central Jira
Preparation of a storage area in the mezzanine for improving the organization and use of the spares
[GASSYSTEMS-652] Preparation of a storage area in the mezzanine for improving the organization and use of the spares - CERN Central Jira