From: Oliver Boettcher
Sent: Monday, 2 June 2025 17:12
To: Sergio Di Giovannantonio <sergio.di.giovannantonio@cern.ch>; Maria Perez Ornedo <maria.perez.ornedo@cern.ch>; Michel Raymond <Michel.Raymond@cern.ch>; Kurt Weiss <Kurt.Weiss@cern.ch>
Dear all,
Please note that I created this Indico page https://indico.cern.ch/event/1555033/ to share the material we discussed and these notes.
The goal of the meeting was to visit the site and to discuss to arrange space and logistics in b.191. for the ATLAS machining worksite.
1) Based on the study realized by Michel and Jamie Pinnell we discussed the preliminary ATLAS space occupation proposal for the building:
The JFSU and JFC3 machining zone is proposed to be installed in the South-West corner of the building close to the access door.
We checked if the required services for the Kuka robot operation are available:
2) We discussed the logistics aspect of the activity:
Rotation procedure need to be further explored by transport colleagues (Maria will speak with colleagues)
3) Worksite preparation:
4) Next steps:
i. SAS requirements (controlled area installation, under pressure operation, storage space for dose readers, material, waste)
ii. SAS cleaning and inspection
iii. Radioactive waste logistics
Your comments are welcome!
Best regards,
Oliver Boettcher
(CERN BE-EA-EC / HL-LHC WP8)