Agenda:

 

Topic 1: SS-bar mock-up:

RHT launched with DIC system. Same cycle as in 927, it will be finished today.

Topic 2: Racetrack coil mock-up:

Components at 927. Installation in the winding machine on-going. We need to define the winding tension.

 

For the MICA layers (and also later for the interlayer) we need to decide what we do and how we cut them. There is the option of cutting at 45 degrees.

 

We also need to decide how to fix the poles:

 

We also need to decide if we put VAMAS and which RHT to launch.

 

Topic 3: RHT gaps in the racetrack mock-up:

 

Topic 4: Two-pole parts 

 

Topic 5: Sliding system and sarcophagus.