Meeting Minutes – Injection Region Design
Date: 11/07/2025
Participants: Patric, Jim, Justin, Daniel, Marlene
Next Meeting: 31/07/2025
EDMS link for sharing drawings (
) is functional and in use.
Despite adding the extension pipe upstream of the injection dipole, a clear aperture conflict remains (radius 7.5 cm, Ø135 mm pipe) with the sextupole.
Action: Eleonora and Marlene to consult P. Schwarz regarding the possibility of removing (shaving off) 2.5 cm from the sextupole.
Estimated space requirement: 30 cm (to be confirmed via thermal simulations).
Apertures: Two apertures are preferred. No modifications expected post-installation; aperture plate can be thick.
Shutters: May be needed. Number of operational cycles to be defined.
Action: Eleonora, Marlene to send the electron beam envelope to Jim.
Note: The gap in this region is very small (~30 cm).
Concern: Does the corrector + BPM assembly fit within the available 250 mm space, including vacuum connection interfaces?
Action: Integration check required to ensure compatibility.
Current distance between the two plasma cells: ~3.349 m.
Action: Marlene to discuss feasibility with Edu and present an update at the next CSCP meeting.
Discussion: Identify which components can be fabricated by the MPP Machine Shop.
Note: A possible visit to GWA in Munich was mentioned.