Last Week
- Ra-223 and Ra-225 shipping.
- ThO Target testing and preparation for irradiation / benchmarking for ThO (SCK-CEN) tests.
- Irradiation of TaC for Tb molecular beam collection (MD + Shipping).
This Week
- Tb-149 and Tb-155 molecular beam collections.
- With delay due to an issue with robot manipulation, was possible to begin collection within 5-6 hours
- Possibly Tb-149 as difluoride (foil retrieval ongoing)
- Irradiation of ThC for Ra-225
- Direct from 17-18 (or 19) June #887M
- Direct with rest of protons from GPS 18-23.06.
- Ra-225 collection for shipment to US
Next week
- Tb-155 shipping to Portugal
- Irradiation of ThC for Ra-225
- Ra-225 collection for shipment to US
- New supplier ThC loading (different batch than previously for #887M) and outgassing