SWT2_CPB:
Continuing EL7 to EL9 migration with data migration, testing rebuild of EL7 storage to EL9, and testing modules.
Purchasing new switches to replace our 1G switches that reached EOL due to recent power incidents.
Making progress on setting temperature threshold on iDRAC devices for safety. When the threshold is reached, the server will shutdown to preserve itself.
We met with a UPS vendor for preventative maintenance on 10/22/2025. Reviewing reports and discussing any improvements we may need to make..
Fixed part of a problem with emergency alerting, but are working toward improving it to avoid rare power incidents such as what occurred on 10/4/2025. Working on adding alerts even if the network goes down, and added a new channel for emergency alerts.
Added additional alerts for better visibility of operations.
Investigated transfer issues that showed jobs failed at SWT2_CPB. Turns out it is an issue with the INFN-ROMA1 site - not SWT2. In fact job is successful and files stored on CPB_DATADISK. We suggested improvements for the future. We believe these jobs should not be failing at our site.
Continuing to change and improve inventory dump script.
Continuing work on moving toward a new alerting system and moving away from Nagios.
OU: