[AI generated minutes + Human correction]

Participants: James, Mark, Wilfried, Justus, Jüri, Gabriela, Lukas (absent), Hampus (absent)

Cadence & Process

Key Upcoming Dates

Technical Status & Discussion

  1. SPS BGI / Beam Size Review
  2. Telescope & Timing
  3. Telescope Infrastructure
  4. PS BGI Horizontal Issue
  5. GBTX Configuration Reliability
  6. Software / DMA

Decisions

Open Issues / Risks

Action Items

Action

Owner

Create JIRA ticket: inventory parts (flex cables, edgeless sensors) & replacement plan for PS horizontal

James

Analyze Thursday MD data promptly (profiles, cross-check with wire scanner)

Lukas

Validate delayed pixel clusters (150 ns) vs Timewalk; filter criteria for hit assembly

Lukas / Hampus

Investigate event rate limitation (readout path, throttling)

Lukas / Justus

Inventory edgeless sensor stock; assess need/order lead time

James / Mark

Assemble spare instrument (if parts sufficient)

James + Mark + Wilfried + Hampus

Prepare granite-table telescope hardware (stages, rails, planes) for Wednesday

Justus (+ Mark assist)

Document cable lengths & propagation delays (oscilloscope fallback)

Wilfried / Justus

Refactor GBTX config state machine (deterministic sequencing, remove double-run)

Hampus

Clarify reset signal usage & document recommended sequence

Justus

Organize V5 software meeting next week

Jüri

Continue DMA migration; coordinate EDGE driver integration

Gabriela / Jüri

Provide pulse generator timing characterization for scintillator reference

Mark

Send meeting transcript and minutes

James / Jüri

Follow-Up Next Meeting

End.