STUDY LONG STRAW PROTOTYPE 25_11_25.pdf
STUDY LONG STRAW PROTOTYPE 25_11_25.pptx
Short prototype:
Peter:
currently, the prototype with HV board - HV cannot be increased to a required value (discharges)
Zdenko:
testing different readout boards
fast RO board - nice signals can be seen
signal 20-40mV, length <100ns, agrees with simulation
Intermediate prototype:
Tonio&François:
test: 2200mm, 400g, 4.6mm with metallization, 5.6mm without metallization - is it the same material?
Long 124-straw prototype:
Vincent:
removed cones from flanges - not needed
removed machining from other flanges, thickness 3cm - gluing to be tested
do need an area with different surface roughness under gas manifold, or a small trench
keep naming (A, B) to distinguish the two sides of the detector, apply or HV boards too
prepared a grounding half-ring soldered to copper cladded kapton foil (shielding, wrapped around the support tube)
Francois will provide the dimensions for holes
Peter:
HV board can be send for production before Christmas, the last thing missing is a confirmation from Vincent that the extension of the board is OK
need to add a feedthrough connector on the fixation plate
Zuzana:
need to launch the production of crimp tubes with Minitubes
need to launch the development of metallized plastic parts with DTI
Hans:
Tonio et Francois will test the gluing of straws in a thicker flange
Rui will try to gold-plate plastic parts