- Shipping of Ra-225 to KUL, BE
- Tb-155 development run from TaC VD-5 target #895M
- Intervention in S-3 by Abel to exchange the cooling of MEDICIS target section turbo pump
- ISOLDE UCx target #865 test for Cu-67 dev run
This Week
- Cu-67 development run stopped yesterday
- About 3-4 MBq collected @01.09.25- report and efficiency pending
- Cu-67 released at low temperatures of 1100 oC
- Intervention in S-2 due to MONTRAC shuttle issues.
- The shuttle got stuck in S-6 by the doors to S-2
- The contact power ring was out of the wheel axis and not touching the power rail
- To be replaced with a spare by Antoine today - Thanks!
- Bug FGC_93 -> update requested at MEDICIS for electrostatic deflector (J. Parra-Lopez)
- Yb-175 ampoule receiving on Wednesday the 3rd
- Decontamination and transfer on 3rd-4th September
- Loading in the target container and on FE on thursday afternoon (friday morning if not dried properly)
- Tb-149 development run wednesday-thursday morning
- Irradiation 2-3rd September
- Sample retrieval thursday 4th September morning.
Next week
-
- Yb-175 collection continued
- Collection stopped on Tuesday 9th morning
- Radiochemistry Tuesday morning in 179/R-002
- Shipping on Wednesday 10th September
- Tb-155 development run from 9th september
- Irradiation of #899M from 3-4th September with additional possibility on 8-9th September.