MEDICIS
- There was a Sc-47 run from TiC-nano last week. Unfortunately the run was cut while the collected activity was nicely raising, because the target failed due to the power cut on friday afternoon.
- A Tb-155 run ongoing thanks to the indirect irradiation we got before the HRS BTY line magnet issue.
- We would like to bring #921M (re-irradiation of ThO2 SCK CEN target) after the target change on HRS and stay indirect.
b.179
- Gas storage
- Old gas storage dismantled
- Temporary metal crates to the left of the main entry. One for full bottles, one for empty ones.
- 1m wide walkway remains between the building and the barriers in place so the gas point remains accessible
- CV during IBDRS works
- MELISSA vents will be closed off with plastic and a metal plate on top to ensure fully sealed
- Equipment on roof will be checked once or twice a week during works, if filters require a change, will request for RP to perform checks beforehand
- Visit from IAEA tomorrow