- Preparation area, close to the buffer zone, should be ok:
- ground point
- 220V socket
- gas: still a question mark. At the North area, Safety allowed me to vent directly to the air
- Prototype will be moved from the North area on Tuesday Oct 7:
- The handling with crane on Monday Oct 6 (Michele will take care)
- Internal transport scheduled on Oct 7 at 2pm from North Area to Est Area
- main gas lines routed

- Maria Teresa got the chambers position info ( see attached file)
- 50x50cm2 chambers should be delivered by Rui at the beginning of next week

- Scintillators


- all the scintillators use the same PMT H11284
- WP could be around 1.3kV, slightly lower for "Bottom" one
- Trackers:
- more info from Alessandro
- DAQ & DQ:
- storage:
- account hcal can be used with cernbox on our DAQ pc, so that we can have a common eos area for DAQ and data; reconstruction can be run directly from lxplus
- Antonello has created an instance for database and grafana for HV monitoring
- 4VMM+FEC+DVMM from RM3 and Naples
- equipment:
- NIM crate + trigger logic
- HV:
- SY mainframe with ethernet connection
- 3 HV boards A7435DN 12CH.3.5KV/3.5MA COMM.FLOAT
- For the tracker, it could be we would need to use the N1470 (NIM HV board) -> moving GEM from ArCO2 to ArCO2CF4 we would need to rise the HV point
- mattermost channel for quick discussion: https://mattermost.web.cern.ch/signup_user_complete/?id=66r6aj1je7ygzxhoohbkhbm3mw&md=link&sbr=su