· BR presents the latest solution for the integration following several collaborative discussions and meetings.
· The new support system designed needs to be checked with BE-GM. If required, the supports could be modified for installation.
· Action: The BGI magnet design will need to be finalised. DB and BR.
· Action: The integration of the MDX magnets need to be re-done for the 100mm aperture. The connections on top of the MDX to also be re-done. DB.
· The vertical MDX already have the connections integrated.
· Action: The MDX systeme de réglages needs to be fixed. DB.
· Action: To confirm on the need for the middle support (for and after installation). CV
· Action: The alignment of the vacuum chambers and magnets need to be discussed with BE-GM. To organise a meeting with J-F.F. WA and CP