# Title Assignee(s) Deadline Status
227 Continue working on North Area BLM detector installation solution (cable connection without human intervention) Zamantzas, Christos - OPEN
228 Implement role-based access for masking in the SIS, requiring approval from a second person and preventing a single operator from masking interlocks and adjusting the SIS Li, Kevin Shing Bruce - OPEN
229 Define the strategy for cycles without function settings, choosing between a non-ppm (global) threshold or a per-user threshold approach Li, Kevin Shing Bruce - OPEN

Minutes

The meeting took place on Friday, November 7^th^, 2025, 10.00h-11.00h, in 874/R-018 and on Zoom.

Participants: A. Butterworth, A. Colinet, C. Lannoy, K. Li, B. Mikulec, L. Nevay, I. Ramirez, R. Secondo, J. Uythoven, C. Wiesner, D. Wollmann, C. Zamantzas.

The slides of all presentations can be found on the website of the Machine Protection Panel and on Indico.

Minutes and actions

D. Wollmann welcomed the participants and reviewed the actions from the 262^nd^ and 263^rd^ MPP meetings.

C. Zamantzas reported that the proposal to add extra BLMs in the north area after the T2-TBIU incident on 16.07.2025 is blocked because installation still requires manual cable disconnection, which would expose personnel to radiation. Although three additional detectors are planned for LS3, only fully robotic intervention is permitted, making the current approach unsuitable. The issue remains open and is being followed by WP2.

ACTION (C. Zamantzas / Integration): Continue working on North Area BLM detector installation solution (cable connection without human intervention).

C. Zamantzas indicated that the API change for the BLM threshold GUI is now scheduled during the YETS, after the ion run, following discussions with B. Salvachua.

Proposal for the connection of the SPS extraction sextupoles and bumpers to the BIS post-LS3 (A. Colinet)

Summary:

Extraction Sextupoles:

Extraction Bumpers:

Current Implementation (Pre-LS3):

Post-LS3 Requirements:

Proposed LS3 Implementation:

Pros of proposal:

Limitations:

Discussions:

J. Uythoven noted that the combination of operator checks, which involve masking unused elements, together with software checks that block North Area extraction if an interlock is masked, works well. However, he highlighted a weak point: a pressured operator could both mask interlocks and adjust the SIS. To prevent this, he proposes introducing role-based access controls so that the same operator cannot perform both actions.

D. Wollmann remarked that this approach breaks the traditional assumption that nothing safety-relevant should reside in the SIS.

Decision:

The Machine Protection Panel agreed that the proposal represents a good compromise between safety and operational flexibility and is better than the current situation, where no protection is in place.

ACTION (K. Li): Implement role-based access for masking in the SIS, requiring approval from a second person and preventing a single operator from masking interlocks and adjusting the SIS.

ACTION (K. Li, EPC, OP, ABT): Define the strategy for cycles without function settings, choosing between a non-ppm (global) threshold or a per-user threshold approach.

ACTION (All): Read the Engineering Specification of the North Area BIS document and give feedback before beginning of December 2025.

With no AOB, Daniel thanked all participants and closed the meeting.