- LHC
- It produces low-mu collisions resulting of up to 50-hour long runs and 1 PB datasets. The low-mu run will be over by the end of the week
- ADC Ops:
- SAM tests are currently failing.
- BOINC submission is broken in the moment.
- Job monitoring artifacts due to overload of the Monit filler. To be repainted
- An ongoing campign to synchronize the SE protocol basepaths. This is needed since tokens are not per protocol.
- CERN CephFS problem was due to SSD Micron 5200 with power_on_hours SMART counter larger than 65536.
- If you have Micron 5* SSDs with power_on_hours > 65536 (i.e. older than 7 years) - please let us know.
- US Cloud Ops
- Armen kindly agreed to help with daily issues for US sites - failures, problems, following up on issues and also summarize still opened issues on Mondays.
- NET2 CE downtime shortening revealed CRIC bug. Still to be solved
- MWT2 storage overload because of a misconfigured user workflow.
- Solved on ADC side, but site storage protection should be put in place (number of connection per pool - reduced)
- TW increased number of slots (to 4k) and also removed FTS limit. Running all ADC workloads now.
- Agreed to decommission NEVIC localgroupdisk