• collected data are now available at /eos/project/m/mpgd-hcal/tb25-PS:
    • all of us participating should have writing rights
    • reading rights guaranteed for all the people in the hcal mailing list

  • the drawing with Z-positions info is now available on confluence
    position of the third GEM to be updated (-> flipped around Y axis, clock-wise 180˚, plus 90˚ clock-wise around Z-axis) 
  • 50x50cm2 chambers:
    • both MMs are now under reparation at MPT:
      • HRS connector with solder on top will be replaced if they didn't manage to clean properly
      • all the gas connectors will be replaced
    • µRWell:
      • first µRWELL ready last friday, while the second one will be ready by this week
      • few iteration in the cleaning process because they were drawing current
  • 20x20cm2 chambers:
    •  µRWELL-Fr02:
      • Alexis will have a look but he has not yet had the time to look at it
    • µRWELL-Fr01:
      • DLC connection to ground detached
  • Mechanical structure:
    • stored at the north area; the lab is not yet equipped with gas lines (not clear when we could start having gas; to be discussed with Karl)
  • Electronics box:
    • still at PS; open a ticket to understand their issue and it looks tomorrow the transport will happen