CERN : 20 persons on each speciality, that concern the project
Bilfinger : 4 persons (Jan, Seraphin, Anaïs, Bruno)
Place : CERN
date : november the 20th, 2025
Minutes
There were many questions asked during the meeting, i was not able to note all these interrogations !
-
macro calendar detail design on CE starts on february 2026
end of project Q3 2031
-
This is the first time something like hot cell exists in CERN
-
part of design is in progress on CERN side, it could change depending on the authorities. They could reject some design especialy for the subdivision of the main wastes
-
Jan asked: What about a spectrical analysis of the result of the cutted wastes. CERN is not sure to do that at this time.
-
need details to set the CE study (starting on fabruary 26.) it will be an add-on to our studies.
-
Bilfinger presents the current study design from the 3 main concerns : size, weight, radioactivity-emmisive
-
We recommand to add of a new space :
-
Bilfinger explain the need to add a "clean" light cell outside of the main cell to make contamination controls.
-
it's a 1 more cell with no radiological protection, but a sealed room anyway.
-
it could be removable, depending of the needs.
-
We precise the trolley is not into the cell when we start cutting.
-
Jan presents some equipment on Iceda as en example for people who do not yet know what a hot cell is.
-
ventilation filtring
-
How do we change the filter ?
-
with telemanipulators, put it in a waste box into the cell
-
no need of particular precautions, because all appens in the cell.
-
we recommand :
-
HVAC : more depression on the different parts of the installation, to garantee the safety of the cells
-
do be discussed, depending on the sealed level on the cells.
-
an ASNR or swiss organisation advise so it's acceptable or not to let burn or control the fire ? it's important to be decided
-
Q Cern : in case of fire what happens?
-
we recommand to close the dampers (and to let it burn until no oxygen)
-
we basically reduce the heat charge to the maximum
-
BE CAREFULL the coil has an epoxy coat.
-
propose a solution to cut fire if it starts
-
neutral gaz injection like Argon for example to replace oxygen
-
fire detection : you can't use conventional systems, because of the electronical parts, we use a fiber optic system to detect fire.
-
we don't need monitorings or measures because concept and calculations garantee that you will never reach the max heat
-
do we need water into the cell, and do we need a under tank ?
-
no water. No tank.
-
if the fire comes from outside ?
-
good question ! Have to consider it. But in fact, the cell is sealed, from inside, and outside ! it should not be a problem.
-
-
Q Cern : Civil Engineering ?
-
there is a need of integration of stainless steel structure to fix the liner.
-
there is another subject : the fixation plates number, size, position....
-
how to do the interface between CE not nuclear and us and our needs ?
-
The windows, the pass through, the doors, the plates, liner….
-
can we optimise the height of the cell
-
yes done. On the new 3d.
-
-
Q Cern : handling :
-
what is the main use of the heavy crane on the top of the batiment ?
-
how do we do the maintenance of it
-
with the maintenance area added over the airlock (we let you see it on the last 3D uptade, transmitted on monday the 24th november).
-
To extend the crane coverage, we have to reduce the thickness of the wall, but to extend it outside to garantee the person protection.
-
Q Cern : how do you ensure the sealed door is close ?
-
there are security measures to ensure it. It’s a airlock with two doors on monitoring. An organisation measure.
-
You need a physical key and a supervision.
-
Be careful of all the accesses even it’s small because nobody should create a security issue with seal failure.
-
Q Cern : possibility to have tools in the cell
-
Yes, specific tools developped for our cell.
-
Q CERN : HVAC
-
ducts class : it's on cern side to definit it
-
how much time to let the depression of the cell come to 0pa ? we don't know at this time of the study. will be define further, into a future detailed study.
-
damper in or out before of after radioprotection ? Out and after
-
how do we verify the pass through radio pro ?
-
we garantee the radio pro by chicanes and conception
ToDo :