CERN : 20 persons on each speciality, that concern the project
Bilfinger : 4 persons (Jan, Seraphin, Anaïs, Bruno)
Place : CERN
date : november the 20th, 2025
 
Minutes
 
There were many questions asked during the meeting, i was not able to note all these interrogations !
 
  1. macro calendar detail design on CE starts on february 2026
end of project Q3 2031
 
  1. This is the first time something like hot cell exists  in CERN 
     
  2. part of design is in progress on CERN side, it could change depending on the authorities. They could reject some design especialy for the subdivision of the main wastes
    1. Jan asked: What about a spectrical analysis of the result of the cutted wastes. CERN is not sure to do that at this time.
    1. need details to set the CE study (starting on fabruary 26.) it will be an add-on to our studies. 
 
  1. Bilfinger presents the current study design from the 3 main concerns : size, weight, radioactivity-emmisive
    1. We recommand to add of a new space :
 
  1. Jan presents some equipment on Iceda as en example for people who do not yet know what a hot cell is.
    1. ventilation filtring
    2. How do we change the filter ?
 
  1. we recommand : 
    1. HVAC : more depression on the different parts of the installation, to garantee the safety of the cells
 
  1. Q Cern : in case of fire what happens? 
 
  1. Q Cern : Civil Engineering ?
    1. there is a need of integration of stainless steel structure to fix the liner.
    2. there is another subject : the fixation plates number, size, position....
    3. how to do the interface between CE not nuclear and us and our needs ?
      1. The windows, the pass through, the doors, the plates, liner….
    4. can we optimise the height of the cell
      1. yes done. On the new 3d.
  1.  
  1. Q Cern : handling :
    1. what is the main use of the heavy crane on the top of the batiment ?
 
  1. Q Cern : how do you ensure the sealed door is close ?
    1. there are security measures to ensure it. It’s a airlock with two doors on monitoring. An organisation measure.
    2. You need a physical key and a supervision.
    3. Be careful of all the accesses even it’s small because nobody should create a security issue with seal failure.
 
  1. Q Cern : possibility to have tools in the cell
    1. Yes, specific tools developped for our cell.
       
  2. Q CERN : HVAC
    1. ducts class : it's on cern side to definit it
    2. how much time to let the depression of the cell come to 0pa ? we don't know at this time of the study. will be define further, into a future detailed study.
    3. damper in or out before of after radioprotection ? Out and after
    4. how do we verify the pass through radio pro ?
      1. we garantee the radio pro by chicanes and conception
 
 
ToDo :