IFIC meeting - 25/11/2025

Acronyms

UPV: Universitat Politècnica de València
TAB: Transmitter Acoustic Beacon
MSM: Mediterráneo Señales Marítimas
EMC: Electromagnetic Compatibility
PCBA: Printed Circuit Board Assembly
IPC 600 / 610 / 620 / 7711 / 7721: International IPC standards for PCB fabrication, assembly, and rework
UPI: Unique Product Identifier
HASS: Highly Accelerated Stress Screening
HALT: Highly Accelerated Life Test
NRB: Non Conformance Review Board
DCR: Design Change Request

 

 

 

Beacon Versions

 

 

 

Software and Design

 

MSM supports UPV for design and Beacon integration

 

Cable and Molding

 

 

Assembly Procedure

 

54 Beacons already produced over approximately 10 years.

It seems a not written procedure is applied. More industrial approach must be applied.

 

Action (Miquel with Stéphane's help): Prepare / review the complete assembly procedure (from component storage, bake-out, soldering procedure too final tests and inspections...)

 

Action Miquel :

Variant and UPI

 

Components

 

Testing and Validation

 

Note: More rust observed on autonomous version because container is in aluminum

Recommendation: Use titanium instead of aluminum also for autonomous beacon

 

Transducer and Integration

 

Refurbishment and Repairs

 

Important note: Functional tests are performed before and after pressure tests. Then an intermittent failure could not be seen if it occurs at high pressure and disappears at atmospheric pressure (could be the case as piezo and soldering are submitted to high pressure)

Action: Daniele and Stéphane propose to prepare an active pressure test with a beacon emitter triggered from outside and a hydrophone to measure beacon emission. Daniele have a feed-through on their hyperbaric chamber at Caserta. He will prepare the material and procedure.

Action: UPV send beacon - Daniele confirm date for pressure test. Stéphane can help to prepare the procedure.

 

Failure Modes and Control

 


 

 

Summary of Actions

 

Carlos Alvarez

  1. Provide the EMC report for Beacons
  2. Investigate smaller resistance options for super capacitors

 

Giorgio

  1. Review cable molding audit with Puma syncV

 

Liz

  1. Coordinate new UPI assignment for refurbished beacons with Cristiano
  2. Propose firmware variants for changes

 

Daniele

  1. Collect information on past failures and integration issues (overcurrent problems)
  2. Prepare active pressure test with beacon emitter and hydrophone at Caserta hyperbaric chamber
  3. Confirm date for pressure test with UPV

 

Miquel (with Stéphane's help)

  1. Prepare the complete assembly procedure (from component storage, bakeout, soldering procedure to final tests and inspections)
  2. Compile a list of repairs and ensure full control over past issues

 

MSM

  1. Confirm CAD software version used for V2
  2. Provide report on pressure, vibration, and ON/OFF cycle tests
  3. Address connector and Piezo soldering procedure with UPV (based on IPC-620 standard)

 

UPV

  1. Review assembly and validation processes
  2. Check PCBA ROMPAL reports for quality level verification
  3. Send beacon to Daniele for pressure testing

 

General Actions

  1.  
  2. Create new variants for electronic board and firmware configurations
  3. Verify if pressure tests were conducted for refurbished units
  4. Perform pressure tests after each refurbishment going forward
  5. Open a DCR for flange thickness design changes for autonomous beacon (aluminum)
  6. Assign new UPI for refurbished units with changes applied
  7. Request CNR sea operation procedures for assembly
  8. Do not test beacons out of water
  9. Consider using titanium instead of aluminum for autonomous beacon containers
  10. Conduct impedance analysis on transducers

 

Stéphane

  1. Help Miquel prepare complete assembly procedure
  2. Help prepare active pressure test procedure with Daniele

 

 

AoB?

 

Please do not hesitate to comment?

What next? New NRB meeting? Establisk a planing?