Short prototype:
Michal:
Zdenko:
Peter:
- running with no overpressure with open end (HV board removed)
- need a bigger bottle
Vincent:
- new directory "New STRAW prototype" to store all related drawings
- We should review and sign drawings related to the short prototype (Francois, Tonio, Michal)
Intermediate prototype:
Tonio&François:
Michal:
- waiting for HV connectivity parts
Long 124-straw prototype:
Vincent:
- new directory "New STRAW prototype" to store all related drawings
- we can review and sign the related drawings
- Thickness of the "second" board (after HV board) - same as HV board (1.9mm)
- designed a "holder" for the HV connectors to be installed using the holes for the handle
- need of an EDMS link to a gluing procedure
- prepared a list of all parts for the prototype, the list is in cernbox directory
Peter:
Michal:
- ordered end-caps for gluing
Zuzana:
- Minitubes have additional 500 crimp tubes in stock, price to be negotiated
Hans:
- straw fixation plates are in production at CERN, flanges are done
- Temur asked about the length of straws - 2.4m
- glue ordered, to arrive in March