- Radiation from beam dumps (neutrons): between floor and beginning of the wall is the target area for this. Could a layer of lead be added? Or a mix of concrete and iron instead of the lead? Any chance to add shielding also inside Separator area to avoid crowding RILIS too much? -> Claudio will do simulations to check
- RIB: assess risks for office area on top of GLM, but also consider contribution from GHM.
- Possible mitigation measure: exclusion zones in case of specific collections.
- Can use historic data for the “worst case scenario”.
- Need from Vincent the distance between GHM collection point to the office area: 1.8 m. Distance between GLM and the floor of the office area: 1.5 m. -> Vincent will create simplified step file to make it easier for RP to measure distances
- Note that the office area is a sas area: so in case of exclusion/limited time area, this can be respected.
- 10-cm concrete floor for the lab, but not for the office/sas area (for easy disassemble in the future).
- Consider three worst case scenarios: for GLM, GHM, IS-COOL.
- Hole for HV piping to IS-COOL with 20cm diameter: need to offset this a little from atop beam line? -> RP discusses internally and transmit decision
- Reconvene in early February -> meeting on 4th of February, exact time and location will be determined