Straw bi-weekly meeting

Europe/Zurich
20/1-004 (CERN)

20/1-004

CERN

15
Show room on map
Hans Danielsson (CERN)
From the same series
    • 09:00 09:15
      Updates 15m
      Speaker: Vincent Clerc

      Short prototype:

      Peter:

      • first wants to test the fast RO
      • then can design a shaper
      • not before 3 months
      • we could get a telescope with 10um resolution

      Zdenko:

      • HV stability
        • 20mbar over pressure
        • used centering pins to align the HV board
        • HV board (RHS) already without resistors
        • LHS: HV board + readout, RHS: HV and termination board - observed trips and HV oscillations
        • LHS: HV board + readout, RHS: HV board only - observed trips and HV oscillations
        • LHS: HV board + readout, RHS: aluminium cover - OK
        • HV board (from RHS) standalone - OK
        • found a black spot under one of the capacitors, could be the explanation (supported by flipping the board, looking at signals, ...)
        • two new boards ordered, in the meantime trying to mitigate the issue with dielectric glue
      • signal shape
        • undershoot with termination board, vs secondary peak with only aluminium cover (without shaper for now)
        • amplitude is large, looks like we are collecting the electrons
        • this is with the slow RO board
        • 3 approaches to signal RO - threshold at half amplitude, 100mV, pedestal (mean noise level) 

      Johan:

      • fast boards - assembly should start next week

      Vincent:

      • waiting for an OK from Michal and Francois to start the approval process of all drawings (assembly)

      Intermediate prototype:

      Tonio&François:

      Michal:

      Long 124-straw prototype:

      Vincent:

      • added O-rings to the vacuum tube drawing
      • to be updated with the real HV connectors on the fixation plate
      • update material of the spacers - needs information
      • prepared drawings for supports holding the tube during the straw installation; Francois - we will modify the old parts

       

      Zuzana:

      • crimp tubes - will go with Minitubes, negotiations ongoing, 500 pc
      • straw plugs (sockets) - ordered 300 pc
      • spring pins - ordered 300 pc
      • HV plug and HV cap
        • investigation ongoing
        • sputtering - Surcotec? We will see on Wednesday.
        • machining - not sure yet
        • material - aim for Ultem

      Hans:

    • 09:15 10:00
      Short prototype tests 45m
      Speakers: Johan Morant (CERN), Michal Zamkovsky (Universite Catholique de Louvain (UCL) (BE)), Peter Lichard (CERN), Zdenko Hives (Charles University (CZ))