Present: Marlene, Patric, Justin, Daniel, Jim
Contract is moving forward.
Manufacturer has no experience operating above 40 °C → lens will require cooling.
Preliminary simulations indicate that adding the measurement system would impact temperature uniformity by approximately 1.5–2.5 °C on axis over ~10 cm (potential for improvement) on axis.
Question: Can additional insulation be added to reduce thermal conductivity?
Next step: Investigate relaxing the cooling requirement to approximately 35 °C.
Actions:
Marlene & Patric: Study the impact of such a temperature dip on injection.
Evaluate purchasing a lens and testing it under elevated temperature conditions.
GWA identified a company capable of vapor-depositing a µm-width gold wire.
Open question: Could tungsten also be used?
Glass coating could be an option, but thermal expansion may be problematic.
PSI has an existing wire tensioning system.
Question: Would it function reliably in a higher-temperature environment?
Action:
Patric to share a picture of the CLEAR cavity BPM.
Vibrations
Feasibility and benefit of adding a third wire at 45°
Possibility of using gold wire
Whether only the fork of the wire system can be purchased
How the tensioning system works and its compatibility with higher temperatures
Required BPM location
Actions:
Marlene to ask Maria Carmen about the upstream bypass volume.
Clarification: Flanges and connections to CERN VSC equipment will remain at room temperature.
Marlene to ask Nicolas which material will be used for the spectrometer vacuum chamber and send the technical drawing to Daniel.
Daniel to share magnetic permeability (µ) values of candidate materials for the large chamber.
Afterward, Marlene to organize a meeting with Vittorio to follow up on mu-metal compatibility.
Aperture changes near the injection area require wakefield simulations of the full beamline (including injection region to the waist), or at minimum expert clearance.
Action:
Marlene to ask Edda who will perform these simulations and request that this task be added.
GWA to provide rough estimates of heat dissipation from racks in TCV4.
No temperature stability requirements currently specified for the racks.
Action:
Patric to organize a meeting with Nicolas to discuss supports.
Action:
Justin to propose a date for the next in-person review.