First batch approved
Samples → mounting, wire bonding, testing before TB → Iskra
W5 V1/V2 TW5 (standard 2 × 2 pixels)
or W5 V2 TW1/2/3 → 0E15 neq/cm² (Zurich + CERN)
W5 V2 TW4/6 → 1.5E15 neq/cm²
Measurements at different sensor tilt angles together with the non-irradiated DUT
W5 V2 TW1/2 → 2.5E15 neq/cm²
W2 V2 TW1/2 → 2.5E15 neq/cm²
Possibly different bias voltage points
25 × 100 µm² CROC to be installed on Monday (Jordi + Antonio)
3 LV and 2 CAEN HV supplies (e-pool – done → Marcos)
Cables + splitter (Leena; splitter I/O (3) found at CERN)
Irradiated wire-bonded samples already at CERN from previous test beams (to be checked)
2 telescope planes missing (telescope to be checked before TB starts) → Iskra + Marcos (next week at H6)
Chubut boards (Leena + Iskra)
Scopes → will use only one for triggering
2 × 5 GS/s CAEN digitizers
One already at CERN (JSI office)
One from Santander
Cold box → same status as before
Newport nano-stages → provided by LHCb (Victor Coco)
1 week + 1 week (parasitic user)
First week: running with TI-LGADs
Second week: + 3D IME structures (2 samples and channels in the CAEN digitizer)