ISOLTRAP:
- Platform replacement preparations: Meeting held for the scaffolding installation: VITO laser tube (high section) and tall pillar to be removed (Transport / VITO users?)
- Could you invite Hanne to future meetings?
- Emergency wall cutting/carrotage: Power outlets and ground cable HIE mezzanine side ongoing (300 CHF) (Jerome Cantet). BC used not correct (being solved). BC needed for material order (Severin d'Armancourt). Wall cutting April(tbc).
ISS:
- alarm from time to time: Low He level
- He filling this week
- Connection to Diesel generator (e-mail James)
Coactivities this week
- LA1 for blue racks -> ok with RILIS?
- SAS is very full, hall is very full
Next week
- Dismantline of Edingburgh chamber stored in HIE-ISOLDE
- Removal of Al boxes from SAS
AOB
- 508 door
- Gas point is full
- Road closure route rutherford (next to b. 133) for 1 month starting next week
- Chilled water - e-mail Erwin