Participants: Eleonora Belli (EB), Vittorio Ferrentino (VF), Philip Schwartz (PS)
Discussion Points:
18 MeV electron line (TT450)
- Magnets from previous run will be reused in the new positions, the layout with the functional positions can be found here: EDMS SPSLAWK_0043
- No additional documentation is required.
- Action (all): Check cabling request.
Proton line (TT41)
- Magnets from previous run will be reused in the new positions, the layout with the functional positions can be found here: EDMS SPSLAWK_0042
- No additional documentation is required.
- Action (all): Check cabling request.
150 MeV electron line (TT451)
See attached slides for more details.
- Dipoles: 2 operational spare units already available at CERN, to be refurbished.
- Action: EB to upload functional specs on EDMS as draft for discussion
- Quadrupoles: 9 units from PSI already available at CERN, confirmed with functional specs (EDMS 3414189), to be refurbished.
- Actions:
- EB to officially release functional specs
- MSC to provide refurbishment drawings, engineering specs and Magnetic Measurements Report (measurements will be likely performed in 867).
- Sextupoles: 6 units from PSI already available at CERN, confirmed with functional specs (EDMS 3414193), to be refurbished.
- Actions:
- EB to officially release functional specs
- MSC to provide refurbishment drawings and engineering specs.
- Sextupole in the injection region: 2 units to be produced, confirmed with functional specs (EDMS 3427939)
- Actions :
- EB to officially release functional specs
- MSC to upload design report on EDMS after internal review
- EN-MME to provide the final drawing
- MSC to provide Technical Specifications and complete the tendering
- Octupoles: 4 units to be produced, confirmed with functional specs (EDMS 3414194)
- Actions:
- EB to officially release functional specs
- MSC to finalise the design report and upload it on EDMS
- EN-MME to provide the final drawing
- MSC to provide Techcnial Specifications and complete the tendering
- H/V correctors: 10 units from CTF3 already available at CERN, confirmed with functional specs (EDMS 3414187), to be refurbished.
- Actions:
- EB to officially release functional specs
- MSC to provide refurbishment drawings and engineering specs.
Actions:
- VF/PS to provide magnet codes to Frederic Galleazzi to be included in the final layout of the 150 MeV line.
- check cabling request
Note: The attached slides also include the accelerating structure and the spectrometer magnets, which are under the responsibility of other CPs. Further details are provided in the slides. -> Action: Marlene Turner to provide functional specs for the spectrometer magnets.