HL-LHC Integration Meeting – Minutes

Date: 13 March 2026
Topics: LSS1/5 installation drawings, HL-LHC tunnel tracing for LS3, integration of dump ancillaries.


Actions


Findings

LSS1 / LSS5 Installation Drawings (Luca Gentini)


HL-LHC Tunnel Tracing for LS3 (Anna-Sarah)

Process for Non-Beam Elements


Integration of Dump Ancillaries