Rota
- 20260225-20260304
- Repack side started to encounter some drive issues after 1 month with 20 tape drives
- TAS could not deal with repack and CTA cannot run without TAS
- Survives 1 month with 20 tape drives, 3 days at Run-3 production scale and only a few hours at Run-4 production scale
- Various puppet issues introduced with CTA 5.11.17 (fixed)
- 20260304-20260311
Tape infrastructure
- Spectra library drive rebalancing done:
- 20 drive in each of the 3 Spectra libraries
- ongoing tape rebalancing
- Repack is over for now until repacked tapes are removed from tape libraries
Use cases
AOBs