Review of scaffolding requirements for HL-LHC LS3 LHC tunnel LSS1 and LSS5 activities (meeting 1)
→
Europe/Zurich
Description
https://cern.zoom.us/j/64119437356?pwd=Ee7Xbo3UeraRKb6suQRD12b2HdcMaB.1
Meeting ID: 641 1943 7356; Passcode: 706160
Svp venir avec 2 slides (pas plus que ça) avec:
- Activités
- Type de échafaudage
- Zone
- Dates de besoin avec planning actuel
- Image si possible
-
-
15:35
→
15:40
WP3/WP9: jumper de- interconnections and interconnection 5mSpeaker: Nicolas Bourcey (CERN)
-
15:40
→
15:45
EN-CV: pipe removal/ installation/ work in RR 5mSpeaker: Theodoros Aivaliotis (CERN)
-
15:45
→
15:50
EN-CV: maintenance area RR 5mSpeaker: Olivier Crespo-Lopez (CERN)
-
15:50
→
15:55
EN-EL: de-cabling/cabling/ cable trays 5mSpeakers: Dimitrios Katsanikos (CERN), Diogo Gameiro (CERN), Georgi Minchev Georgiev (CERN), Nuno Dos Santos (CERN)
-
15:55
→
16:00
EN-THE: mono rail modifications 5mSpeaker: Maria Perez Ornedo (CERN)
-
16:00
→
16:05
EN-ACE: metallic structure modification 5mSpeaker: Jordi Bossy (CERN)
-
16:05
→
16:10
SCE: RR platform 5mSpeaker: Severin D'Armancourt (CERN)
-
16:10
→
16:15
WP15: protection in UJ22 5mSpeaker: Francesca Paola Nicoletti (CERN)
For magnet transport : protective scaffolding over collimator and beamline on TI2 side
Activity responsible : Maria Perez Ornedo, Davide Bozzini
For cutting metallic bar : No need for scaffolding
- for performing the activity : a cherry picker will be used.
- for the protection of the machine : Installing scaffolding would present a higher risk than carrying out the activity itself; therefore, no scaffolding is planned. Instead, alternative risk mitigation measures will be implemented.
Activity responsible : Jordi Bossy
-