Summary of Actions :

  1. Measuring the blocks at the mezzanine exit, completing the mezzanine assembly, and 
    improving the readability of figures in the documentation. Yann/Elsa
  2. Separate floor-space occupancy from rack and stack storage indicators. Alexandre
  3. Evaluate the use of the south-west access doors of Building 954 in view of future 
    access  constraints around BA80 and Building 954. Cédric/Elsa   
  4. Coordinate with SCE, RP and THE to characterize and assess the cartridges stored in 
    Building 954, identify those that can be removed, and free space for the six activated 
    cartridges arriving from the SPS North Area before LS3. Cédric/Elsa
  5. The refuge area must be clearly indicated in Cédric’s B954 layout presentation for Q1/Q2 
    2027. Cédric
  6. Lifting beam: provide a status update at the next meeting on 25 June. Julien
  7. Updated Measurement List: supervised areas Elsa will check whether the “noun-found” 
    items still exist within the buildings.