- Stef, Frame RPC to be modified by Fabio (1/2 days):
- drawings sent to Fabio, material arrived in the atelier
- ideally before the 15th of July
- panel for 256 (Maria Cristina)
- Stef, PicoSec µLoop (1 day):
few modification to be done to the set-up: 2-way valve to be added before the purifier, bubbler replaced by a rotameter, addition of a rotameter in the loop if there is the same, make a sampling point DONE, MERCI!
- one purifier cartridge needed for a fast test, the shorter the better, 22cm diameter
- Stef & Max, RPC & µRWELL Beam Test - NA
- 13/14th July - Fabio needed to bring the detectors + the mixer
- 2nd one uCL elec part to be completed asap