• exhaust vacuum pipe rerouting:
    • information required from OP side for planning of vacuum pipe removal works 
    • when can we intervene and is it likely that EPC checks can continue past August?
    • ECR for this (ISL-VC-EC-0001) is in preparation and almost ready for eng. check
  • tomorrow morning crane usage
    • HRS door shielding block remove
    • GLM wall rebuilt
    • Old BI rack temporarily moved to a more covenient location for the transfer from old to new rack
  • crane zoning needs to be defined -> required for derogation of exceeding the max distance of 50cm to the crane