- exhaust vacuum pipe rerouting:
- information required from OP side for planning of vacuum pipe removal worksÂ
- when can we intervene and is it likely that EPC checks can continue past August?
- ECR for this (ISL-VC-EC-0001) is in preparation and almost ready for eng. check
- tomorrow morning crane usage
- HRS door shielding block remove
- GLM wall rebuilt
- Old BI rack temporarily moved to a more covenient location for the transfer from old to new rack
- crane zoning needs to be defined -> required for derogation of exceeding the max distance of 50cm to the crane