- Monitors:
- Monitor 1: Next to BI rack on GLM shielding wall
- This monitor is flexible in the position
- Vincent can propose a spot to RP that works best for integration
- Monitor 2: Next to HRS door
- Proposed spot is close to where it originally was
- Next to new electrical rack on the wall
- This should keep the line of site required for the tape station
- One suggestion from Elodie is to maybe have a long cable for this probe and have the option to be able to move it closer to the beamline on a temporary stand
- Monitor 3: On the roof, attached to shielding where old laser roof access ladder was
- This monitor is no longer useful here
- Useful to keep monitoring the activated water that goes around the shielding on the opposite wall
- RP to propose a location on the opposite wall
- Monitor 4: Inside lab
- RP to propose a location
- Initial suggestion is they would like it similarly placed to how it was before in the center of the wall by EBIS
- Monitor 5: New portable monitor
- This will have the ability to roam the lab
- Just require one place for an outlet and a long enough cable to move it around
- Open ventilation portholes to HRS where pipes run through
- RP to confirm if these now need to be fenced off since with the new platform this will now be at head height
Next steps:
- RP to take some screenshots and propose some locations then Vincent will check with integration if the locations fit
- If longer cables are required due to monitors being moved around, this will be up to the RP team to follow up on this