Dusan Vudragovic June, 2007 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- - Finalizing D3.1b – Infrastructure deployment plan - Grid Operator On Duty for one week - SEE-GRID SAM supporter - SEE-GRID helpdesk activities - create the script (ch-lfc-dpns-own) that collects all subgroups and roles from VOMRS/VOMS servers and for these entire adds permissions for to VO specific directory on LFC server - Documentation regarding ch-lfc-dpns-own script - Update of SEE-GRID wiki pages This month I was working really hard on 3.1b – Infrastructure Deployment Plan and it is now in final state. Together with Ivica (RCUB) I have created ch-lfc-dpns-own script. It solves "no permission" problems when user tries to write to VO specific directory using a role or a secondary group. The script collects roles, puts them in LFC database and gives them permission to VO specific LFC directory at first. Afterwards, this is applied to secondary groups. I supplied SEE-GRID wiki pages with its documentation as well. SEE-GRID Hepldesk ticket page was updated by me too. A part from this, I was occupied with standard SEE-GRID operational activities. Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- - Configuration of tomcat DN base authentication for SAM programmatic web interface - ROC on duty for one week (25-29 June) - SAM supporter for one week (4-8 June) The most of time I spent performing configuration of tomcat DN base authentication for SAM programmatic interface. For now it works using IP based authentication that is not appropriate. I have finished it and it needs to be put it in production. A part from this, I spent one week as ROC operator on duty and one week more as SAM supporter during the month. Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- - wLCG/ EGEE Grid Operations Workshop in Stockholm - WLCG-OSG-EGEE Operations meeting (CERN conferencing service, June 25) http://indico.cern.ch/conferenceDisplay.py?confId=17856 - SAM weekly meetings - IT-GD-OPD weekly meetings Beside weekly SAM and IT-GS-OPS meetings I attended WLCG-OSG-EGEE Operations meeting on June 25. I spent three days in Stockholm at wLCG/ EGEE Grid Operations Workshop. Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ - 1 day Last month I was on holydays for 1 day. TimeSheet for the month ------------------------------------------------------------ WP3 A3.1 100% All my activities can be characterized as WP3 A3.1 activities. Infrastructure status ------------------------------------------------------------ - 30 of sites in project - 12 of sites contributing to the EGEE production infrastructure - 938 of cpus - 22.65TB total SE