Domenico Vicinanza August, 2007 Major work for EUMEDGRID; major changes in workplan ---------------------------------------------------------------- - SAM Server maintainance (working on the server side for scheduled maintenance): -- Installing SAM server (as backup) on Scientific Linux 4 -- problem with BDII2Oracle execution fixed (new sites were not correctly discovered). -- fixed webservice connection between SAM server and SAM client - Upgrade of SAM client (with backups) to be compliant with CA update 1.16 - Troubleshooting for the Algerian site (se01.grid.arn.dz) for failing SE tests - Contributed to Chapter 7 of the EGEE deliverable "The Infrastructure Planning Guide" (the Cook-book) - Report on CMSSW installation and testing guide, final version on http://cern.ch/vicinanz/cmssweumed - Support to EUMED siteadmins to help fixing site configuration problems to install CMSSW software Major work for GD-OPS; GD-ITR; major changes in workplan ---------------------------------------------------------------- - Prepared for the first year Induction interview - SAM Test integration: -- Continued ATLAS Experiment test integration: preparation of a testing environment to allow ATLAS people to safely launch tests and publish results on a development database -- Continued the development, started within EUMED WP3 activities, of the notification tool for site admins. Customized frequency of the alarms, added inline options. The tool is in production for ALICE, it is going to be deployed within ATLAS and LHCb soon. -- Finished integration of LHCb tests (basically complex tests doing software installation/validation), now in production - SAM Documentation: -- Finished SAM server installation guide for SLC4. - SAM Support (GGUS) Major events attended (include links to event/presentation) ---------------------------------------------------------------- - SAM Team and IT-GD-OPS weekly meetings Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------ Holidays during the period ------------------------------------------------------------ 11 day TimeSheet for the month ------------------------------------------------------------ WP3/A3.2 and 3.3 60% WP4/A4.2 and 4.3 40% Infrastructure status ------------------------------------------------------------ # of sites in project: 12 (10 Countries, 8 Mediterranean Countries) # of sites contributing to the EGEE production infrastructure: 5 # of CPUs: 720 (120 CPUs are in gLite CEs) total SE: 9 total CE: 12 total gCE: 9 total RB: 6 total gRB: 2 total FTS: 0 total LFC: 1 total Local LFC: 0 ************************************************************