Konstantin Skaburskas August, 2007, month 20 Major work for Health-e-Child; major changes in workplan ---------------------------------------------------------------- WP5/T5.2 15% (1-9 M) (13-30 M) - Commented on HeC's input to "EGEE07 Projects Achievements Booklet" for EGEE'07 conference. - Preparation of HeC presentation for "CoreGrid Summer School 2007, Budapest, Hungary, 3-7 September, 2007." WP5/T5.6 30% (13-30 M) - gLite Production Updates 32, 33 applied on core services and at sites CERN[1,2]-Geneva-CH - Due to the fact that I did not have time to replace gLite-CEs with LCG-CEs on HeC infra I had to debug problems with BLAHP on gLite-CEs. blahpd doesn't return to gridmanager a job id of a job submitted to LRMS. WP5/T5.7 00% (18-30 M) - WP5/T5.8 00% (18-30 M) - WP5/T5.9 20% (13-30 M) - Helped with gridification of a service which is part of HeC G/W. New service should allow to offload the HeC G/W from the necessity to generate thumbnails of large DICOM files. Now this will be done on grid CEs. WP5 Deliverable 5.1 - 15% (M 18) “Report on the delivered prototype Grid Platform (PDI and grid interfaces to gLite services)” WP14/T14.1 00% (13-30 M) - WP14/T14.2 15% (13-30 M) - Virtual Machine where SAM instance for HeC was installed got problems with file system. Investigated. Till now I was not able to repaire the file system. Apparently reinstallation will be required. Now SAM on HeC is not working. WP14/T14.5 00% (18-30 M) - WP14/T14.6 00% (18-30 M) - WP14/T14.7 00% (18-30 M) - WP14 Deliverable 14.1 - 05% (M 18) “Report on the status of the Platform deployment in PP and PROD environments” Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- (GD-OPS) - GMOD backup: 20-27 Aug - GMOD: 27 Aug - 3 Sept - PPS gLite Update 38 * new WMSLB (codebase gLite 3.1 for 3.0 gLite PPS release) installed from scratch. - updated/submitted a number of bug reports (GD-SAM) - got assigned 3 SAM bugs to work on. By now provided a solution to one of them. (GD-ITR) - helped ITR testers to debug jobs submission to OSG sites in PPS. Major issues arising -------------------- - Major events attended (include links to event/presentation) --------------------- - Synchronization meeting (after vacations) with WP5 and WP14 members from Maat. CERN, 23 Aug 2007. Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- - CoreGrid Summer School 2007, Budapest, Hungary, 3-7 September, 2007. Registered as tutor and will attend 5-7 Sept. with presentation about HeC. Holidays during the period ------------------------------------------------------------ * days (1 - 17 Aug) 13 *TimeSheet for the month *20* ------------------------------------------------------------ WP5/T5.1 --% (1-6 M) DoWI WP5/T5.2 15% (1-9 M) (13-30 M) WP5/T5.3 --% (7-12 M) DoWI WP5/T5.4 --% (10-15 M) DoWI WP5/T5.5 --% (16-18 M) DoWI WP5/T5.6 30% (13-30 M) WP5/T5.7 00% (18-30 M) WP5/T5.8 00% (18-30 M) WP5/T5.9 20% (13-30 M) -- WP5 D5.1 15% (M 18) WP14/T14.1 00% (13-30 M) WP14/T14.2 15% (13-30 M) WP14/T14.3 --% (18-30 M) CERN 0% WP14/T14.4 --% (13-30 M) CERN 0% WP14/T14.5 00% (18-30 M) WP14/T14.6 00% (18-30 M) WP14/T14.7 00% (18-30 M) WP14/T14.8 --% (18-30 M) CERN 0% WP14/T14.9 --% (18-30 M) CERN 0% -- WP14 D14.1 05% (M 18)