Upcoming TB Start: 15.07. (Wednesday)
- SRC Off plan ahead of TB for GIF not yet, but Stef & I would need Fabio for support setting up the RPC detectors at the irradiation area: 13.07. and 14.07.
- Also, we need one more support to hold the RPC in position in the frame (as Fabio has produced for the November TB) -> Max will contact fabio for this
- Lab256: We need a small metallic support in the rack (like an "etage") to place the black heater; rough dimensions (needs to be double checked): 52 cm x 22 cm done
- panel for 256 (Maria Cristina
- Stef & Max, RPC & µRWELL Beam Test - NA
- 13/14th July - Fabio needed to bring the detectors + the mixer IN THE PLANNING W29
- modify mixer