BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CERN//INDICO//EN
BEGIN:VEVENT
SUMMARY:HL-Cryo FP in LAYOUT DB and Roadmap Discussion for import EAM DB
DTSTART:20260720T080000Z
DTEND:20260720T093500Z
DTSTAMP:20260813T221400Z
UID:indico-event-1710950@indico.cern.ch
DESCRIPTION:Cryogenic Methods meeting\nFunctional positions in EAM DB for 
 the equipment/instruments of the HL-QXL (in the LHC tunnel) have as sourc
 e (Single Source of Truth) LAYOUT DB. A synchro mechanism imports the posi
 tions to EAM DB with the names\, hierarchy\,... and possibly classes\nThis
  meeting will clarify the needed information to integrate QXL positions in
  LAYOUT DB. \nDiscussion on possible roadmap will be initiated with some 
 information when the position could be available in EAM DB. \nThis meetin
 g is the opportunity to confirm what will be integrated in Layout DB and w
 hat will not. Obviously\, any equipment in the tunnel are including. Howev
 er there is still need to confirm for the DFHX and some QXL transfer lines
  between the QURC/QUI and the tunnel.\nThe goal of the meeting is to repor
 t on the status of the integration of the HL QXL functional positions (LHC
  tunnel) in LAYOUT DB and foreseen dates for possible synchronisation/impo
 rt to EAM DB\, alternatively discussing the possibility of partial import 
 to give more flexibility. The point related to the information required fo
 r the control system could be discussed.   \n \n\nhttps://indico.cern.c
 h/event/1710950/
LOCATION:36/S-014 (CERN)
URL:https://indico.cern.ch/event/1710950/
END:VEVENT
END:VCALENDAR
